The Intake and Intake channelPressure Regulator Tower
Overall pressure pipeline is 2155m in length, connecting from 245.0m elevation factory to 1045.0m elevation valve housePressure pipe at the elevation of 1045.0m goes down the factoryThe pressure pipeline section crosses National Highway 27And is connected to the factory with an installed capacity of 80MW