C47

  • Tiếng Việt
  • English
  • Home
  • Introduction
    • General Introduction
    • Download Introduction
    • Achievements and Awards
    • Organizational Chart
    • Communist Party & Unions
    • Quality Policy of Company
  • Works & Projects
    • Hydraulic Works
    • Hydroelectric Works
    • Civil & Industrial construction works
    • Video Clips
  • Investment
    • Construction & Services
    • Equipments & Technology
    • Other Sectors
  • News & Events
    • News
    • Science – Technology
    • Reportage – Special subject
    • Economy – Social Affairs
  • Shareholder Relations
    • Shareholder information
    • Financial Report
    • Annual Report
    • Announcement
    • Shareholder Meeting
    • Minutes & Resolutions
    • Management reports
    • Charters & Regulation
  • Information
    • Bidding
    • Recruitment
    • On-going projects undertaken by C47
  • Contacts
C47 > Articles by: admin_c47

08/09/2014 by

Conqueringthe weather, advancing the progress at Trung Son hydropower project

Thousands of workers are winning the harshness of weather to construct Trung Son hydropower project in Co Me valley (Trung Son commune, Quan Hoa district, Thanh Hoa province). Not only advance in the progress but also this is a site safety model project.

Arrival atTrung Son Hydropower Project, we plan to go to the construction site as soon as possible when arrived Co Me. Then the sudden afternoon rain caused the car can not move up. The next day morning jump into the car, driver of Trung Son Hydropower Management Board said: must use a special car for mountainous road and the drivingexperiencecan drive on this road, otherwise “you can not move on road” … Indeed, after an hour roughly driven, our car passed a road section less than … 2.5 km from the office of Project Management Board to themain construction site.

Từ khi khởi công, tại thủy điện Trung Sơn chưa xảy ra vụ tai nạn lao động nghiêm trọng nào - Ảnh V.Lương
Since the start of construction, have no serious occupational accidents at Trung Son hydropower project– Courtesy by V.Luong

In contrast with the remote mountain is a busyand urgent working atmosphere, Phan Thanh Nhan, 29, from Nghe An province, is a worker of Construction Joint Stock Company 47 shared: “I used to work in the construction at dozens of hydropower plants in all over the country, but there is no place with the harsh climate like here. The rain is pouring out, the sun is shining brightly, so the construction of Trung Son hydropower plant met many difficulties, etc”.

Nguyen Trong Luc, a worker who also attached to many hydropower projects, admitted “The weather in Co Me valley is so harsh. There was a day raining from morning to night, there was day withharsh sunny throughout the day. Not to mention, while it is sunny and raining, it is raining and sunny, etc. greatly affect our work”.

Facing the above difficulties, to ensure the progress of construction work and to avoid extreme weather, Mr. Ngo Quoc Phuong, Deputy Director of Trung Son Hydropower Project Management Board said: The Contractor was requested to arrange for workers to work early and leave early (working from 6:30am to 10:30am and 14:00pm to 18:00pm) to ensure the safety on the health of engineers and workers at the job site but ensure the construction progress of the project.

Not just the progress …

In 2013, the works has two main objectives: to complete the flood control task before June 2013 and river blocking to be completed in December 2013. The flood control has been completed before 30 June, and now the job site is under construction ofthe diversion culvert, with the volume of excavation and filling reached 50%. As planned, it will be completed in October, 2013, but with the current progress, the works can reach the target 2 months ahead of schedule.

Observing the whole construction site, there are thousands of workers of Construction Joint Stock Company 47 are excavating rocks, installing rebars and pouring concrete. In particular, each construction team shall include one staff for safety and health care. These staffs are responsible for spending knowledge and checking on occupational safety and health measures to workers before working.

Mr. Nguyen Quang Chinh, AECOM Consultant, Main Supervision Consultant said as the analysis: “Trung Son hydropower project always requiredto comply withthe constructionsafety regulationsstrictly. It can be said that this is a model project of labor safety, environment and livelihood for theresettledpeople. From the commencement day till now, there is noserious accident occurred on the jobsite”.

The gained results are just the beginning, there will be a lot of difficultiesahead. But with efforts of the Employer and the contractors are trying each hour and day to complete the items, bringing the project to the destination on time. (X.Vien – V.Luong)

As reported by Thanhnien.com.vn

Filed Under: Reportage - Special subject

06/09/2014 by

Investment for Dinh Binh ecotourism spot

Under approval of Binh Dinh Provincial People Committee about the permittance of CC47 invest and exploit tourism business activities in the Dinh Binh reservoir area at Vinh Hao commune, Vinh Thanh district, Binh Dinh province after constructing Dinh Binh reservoir project to be completed.

CC47 is carrying out survey & detailed plan of this tourism spot. It is expected construction on the basin area of reservoir, with area of over 20 hectares included main sections as: watersport game section, camping section, ecotourism spot, water park; pavilion houses & cabanas. Total capital of project is over 18 bill VND.

Filed Under: Other Sectors

10/09/2013 by

Annual report 2012

*/ View or Download: Here

Filed Under: Annual Report

03/08/2013 by

Thuong Kon Tum Hydropower Project

Filed Under: Video Clips

17/10/2012 by

Invest on equipments to enhance construction progress of RCC in Dong Nai 4 hydroelectricity plant

In order to enhance construction progress and to ensure RCC quality of Dong Nai 4 hydropower project. In the past time, CC47 has invested more than 2 billion VND for purchasing special equipment of the sweeper & sucker truck, model MS6RS produced by Hyundai Korea in 2009: its purpose is cleaning and sucking water on the RCC surface.

Sweeper & sucker truck, model MS6RS

The company is making procedure & documents and quickly put the truck into operation for RCC contruction work in Dong Nai 4 hydropower project.

Sweeper & sucker truck, model MS6RS
Brush, model MS6RS

Filed Under: Equipments & Technology

  • « Previous Page
  • 1
  • …
  • 57
  • 58
  • 59
  • 60
  • Next Page »

SUPPLIERS & CONTRACTORS PORTAL

The C47 brand has now become a quality guarantee for world-class buildings. Click on the link to join Supply Chain C47

Submit/RegisterFeedback
0256.3522166
HOTLINE

VIDEO

Công ty Cổ phần Xây dựng 47

Construction Joint Stock Company 47

Kỷ niệm 45 năm thành lập Công ty Cổ phần Xây dựng 47

45th Year Anniversary for establishment of Construction Joint Stock Company 47

Music: Hát về Công ty 47 anh hùng

https://www.xaydung47.vn/wp-content/uploads/2021/03/C47_AH_FIle_Goc.mp3

RECRUITMENT

We’re looking for Assistant to Chairman

Announcement of second recruitment in 2018

Announcement of labor recruitment phase 1 in 2018

Recruitment announcement for the first phase of 2017

Announcement of labor recruitment phase 3 in 2016

COMPANY INFO

  • General Introduction
  • Achievements and Awards
  • Organizational Chart
  • Communist Party & Unions
  • Quality Policy of Company

INVESTOR RELATIONS

  • Information
  • Financial Report
  • Annual Report
  • Announcement
  • Minutes & Resolutions

CONTACTS

Main Office Building C47:
  • No 8 Bien Cuong - Quy Nhon - Binh Đinh
  • 0256.3522166 - 0256.3522931
  • c47@xaydung47.vn

C47

Copyright © 2025 Công ty Cổ phần Xây dựng 47
Developed by Vũ Phong Energy Group