C47

  • Tiếng Việt
  • English
  • Home
  • Introduction
    • General Introduction
    • Download Introduction
    • Achievements and Awards
    • Organizational Chart
    • Communist Party & Unions
    • Quality Policy of Company
  • Works & Projects
    • Hydraulic Works
    • Hydroelectric Works
    • Civil & Industrial construction works
    • Video Clips
  • Investment
    • Construction & Services
    • Equipments & Technology
    • Other Sectors
  • News & Events
    • News
    • Science – Technology
    • Reportage – Special subject
    • Economy – Social Affairs
  • Shareholder Relations
    • Shareholder information
    • Financial Report
    • Annual Report
    • Announcement
    • Shareholder Meeting
    • Minutes & Resolutions
    • Management reports
    • Charters & Regulation
  • Information
    • Bidding
    • Recruitment
    • On-going projects undertaken by C47
  • Contacts
C47 > News & Events > News > Emulation campaign in Hoa Binh Hydropower Plant Expansion Project

08/10/2021 by

Emulation campaign in Hoa Binh Hydropower Plant Expansion Project

On October 1, in Hoa Binh, Vietnam Electricity, Vietnam Electricity Trade Union, and a contractor joint venture (Truong Son Construction Corporation, Construction Joint Stock Company 47, LILAMA 10 Joint Stock Company) held an organization launch an emulation for the construction of the expanded Hoa Binh Hydropower Plant, with the goal of completing the entire project by 2024.

The units are committed to completing the expansion of the Hoa Binh Hydropower Plant on time in 2024.

The expanded Hoa Binh Hydropower Plant is a special grade construction project approved by the Prime Minister for investment policy and directly presided over the groundbreaking ceremony on January 10, 2021. This is an important work in order to increase the capacity of generating peak covering capacity for the national power system, facilitate the maximum exploitation of the excess water discharged annually in the flood season of Hoa Binh Hydropower Plant to generate electricity; improve the ability to regulate frequency and stabilize the national power system.

This is also a national important project in terms of security, requiring an absolute level of safety in difficult construction conditions due to its location in the city, narrow ground, difficulty in ground clearance and the influence of security issues and social impacts.

Leaders of the EVN Group and the Vietnam Electricity Trade Union presented gifts to units to encourage them.

Do Duc Hung, Chairman of the Vietnam Electricity Trade Union, stated at the launching ceremony that on May 21, the General Director of the Group and the Standing Board of the Vietnam Electricity Trade Union decided to coordinate with the contractors to organize the emulation movement to build the expanded Hoa Binh Hydropower Plant.

The goal is to create a competitive environment in which the units involved in the construction unite and cooperate to strive for excellent task completion while also instilling a sense of responsibility and the will and determination to overcome difficulties to complete the project on time by 2024.

Do Duc Hung, Chairman of the Vietnam Electricity Trade Union, expresses a desire that all construction units, joint venture contractors, and the project management board encourage creativity and experience in order to organize a productive and appropriate construction process. Coordination with local authorities, units within and outside the Electricity sector to ensure that the construction of the expanded Hoa Binh Hydropower Plant proceeds as planned. Many typical examples of the emulation movement will appear on the construction site.

Recognizing the importance and significance of the emulation movement, the Vietnam Electricity Group, the Vietnam Electricity Trade Union, and the contractor joint venture agreed at the ceremony to organize the emulation and decide evaluation milestones to a reward collectives and individuals with outstanding performance; to regularly organize activities to visit, encourage and take care of the lives of workers involved in construction on construction sites.

Filed Under: News

RELATED POSTS

C47 Wins and Signs Contract for Work of Package XL04-TAMR: Construction and Installation of Tri An Hydropower Plant Expansion Project, Valued at VND 1,451 Billion

C47 Wins and Signs Contract for Work of Package XL04-TAMR: Construction and Installation of Tri An Hydropower Plant Expansion Project, Valued at VND 1,451 Billion

Through an open online domestic bidding procedure, Construction Joint Stock Company 47 (HOSE: C47) — A member of the JV Contractors including Lung Lo Construction Corporation, Song Da Corporation – ...
C47 participated in the Workshop on Job and Recruitment Trends in the Construction Sector

C47 participated in the Workshop on Job and Recruitment Trends in the Construction Sector

Recently, on May 31, 2025, Faculty of Hydraulic Construction, University of Science and Technology - University of Danang organized the Workshop "Job and recruitment trends in the construction sector", Construction ...
Commencement of Nam Neun 1 Hydropower Project – A New Milestone for Clean Energy in Lao PDR

Commencement of Nam Neun 1 Hydropower Project – A New Milestone for Clean Energy in Lao PDR

On April 29, 2025, in Nong Hed district, Xieng Khouang province, Lao PDR, the EPC Contractor Consortium comprising Construction Joint Stock Company 47 (CC47) and Power Engineering Consulting Joint Stock ...
C47 successfully organized the 2025 Annual General Meeting of Shareholders and elected the Board of Directors for term 2025 - 2030

C47 successfully organized the 2025 Annual General Meeting of Shareholders and elected the Board of Directors for term 2025 – 2030

On April 23, 2025, at the 11th floor Hall, Building C47 - Hai Au Bien Cuong Hotel, No. 8 Bien Cuong Str., Quy Nhon City, Binh Dinh Province, Construction Joint ...
Chairman of the Board, Mr. Pham Nam Phong made the site visit and inspecting the Construction Progress at Nam Neun 1 Hydropower Project

Chairman of the Board, Mr. Pham Nam Phong made the site visit and inspecting the Construction Progress at Nam Neun 1 Hydropower Project

Recently, March 31, 2025, the Chairman of Construction Joint Stock Company 47 (HOSE: C47), Mr. Pham Nam Phong visited and inspected the construction progress at Nam Neun 1 Hydropower Project, ...

SUPPLIERS & CONTRACTORS PORTAL

The C47 brand has now become a quality guarantee for world-class buildings. Click on the link to join Supply Chain C47

Submit/RegisterFeedback
0256.3522166
HOTLINE

VIDEO

Công ty Cổ phần Xây dựng 47

Construction Joint Stock Company 47

Kỷ niệm 45 năm thành lập Công ty Cổ phần Xây dựng 47

45th Year Anniversary for establishment of Construction Joint Stock Company 47

Music: Hát về Công ty 47 anh hùng

https://www.xaydung47.vn/wp-content/uploads/2021/03/C47_AH_FIle_Goc.mp3

RECRUITMENT

We’re looking for Assistant to Chairman

Announcement of second recruitment in 2018

Announcement of labor recruitment phase 1 in 2018

Recruitment announcement for the first phase of 2017

Announcement of labor recruitment phase 3 in 2016

COMPANY INFO

  • General Introduction
  • Achievements and Awards
  • Organizational Chart
  • Communist Party & Unions
  • Quality Policy of Company

INVESTOR RELATIONS

  • Information
  • Financial Report
  • Annual Report
  • Announcement
  • Minutes & Resolutions

CONTACTS

Main Office Building C47:
  • No 8 Bien Cuong - Quy Nhon - Binh Đinh
  • 0256.3522166 - 0256.3522931
  • c47@xaydung47.vn

C47

Copyright © 2025 Công ty Cổ phần Xây dựng 47
Developed by Vũ Phong Energy Group