C47

  • Tiếng Việt
  • English
  • Home
  • Introduction
    • General Introduction
    • Vision – Mission – Core values
    • Download Introduction
    • Achievements and Awards
    • Organizational Chart
    • Communist Party & Unions
    • Quality Policy of Company
  • Works & Projects
    • Hydraulic Works
    • Hydroelectric Works
    • Civil & Industrial construction works
    • Video Clips
  • Investment
    • Construction & Services
    • Equipments & Technology
    • Other Sectors
  • News & Events
    • News
    • Science – Technology
    • Reportage – Special subject
    • Economy – Social Affairs
  • Shareholder Relations
    • Shareholder information
    • Financial Report
    • Annual Report
    • Announcement
    • Shareholder Meeting
    • Minutes & Resolutions
    • Management reports
    • Charters & Regulation
  • Information
    • Bidding
    • Recruitment
    • On-going projects undertaken by C47
  • Contacts
C47 > News & Events > News > Highly appreciated on the capacity, C47 was continuously awarded more contract amendments by the Client of Hoa Phat Dung Quat II Project, totaling the signed contract value over 440 billion VND

17/10/2022 by

Highly appreciated on the capacity, C47 was continuously awarded more contract amendments by the Client of Hoa Phat Dung Quat II Project, totaling the signed contract value over 440 billion VND

Appreciated for its construction capacity, progress and quality, Construction Joint Stock Company 47 (HOSE: C47) continued to be signed more contract amendments by the Client – Hoa Phat Dung Quat Steel JSC for additional workload with pre-tax value of more 201 billion VND, totaling the signed contract amount up to 440.9 billion VND.

On September 28, 2022, Construction Joint Stock Company 47 (HOSE: C47) was awarded and signed the Amendment No.6 to the Original Contract No.0388/2022/HDXD/HP-CC47 by the Client – Hoa Phat Dung Quat Steel JSC for additional workload under the Package of ground lowering construction of Zones 32A and 51A – Hoa Phat Dung Quat 2 Steel Integrated Complex Project valued more 201 billion VND, totaling the signed contract value before tax up to 440.9 billion VND.

Pictures of the current status of construction site at Hoa Phat Dung Quat 2 Steel Integrated Complex Project

Hoa Phat Dung Quat 2 Steel Integrated Complex Project, with a construction area of over 280 hectares, adjacent to Hoa Phat Dung Quat 1 Steel Integrated Complex Project, designed capacity of 5.6 million tons of hot rolled coil (HRC) per year, total capital of 85,000 billion VND invested by Hoa Phat Dung Quat Steel JSC and expected to be completed and put into operation in 2024.

Manpower and equipment are prerequisites to ensure completion of the schedule and workload that assigned to C47 by the Client. From the works commencement until now, C47 has concentrated all resources for the construction of items, excavation work to lower the ground of the project with total volume of about 2,500,000 m3 (of which: earth excavation nearly 1,100,000 m3, rock excavation nearly 1,400,000 m3).

Expected that next time C47 will increase additional manpower and equipment for the construction to ensure the progress, in which priority completing the deep excavation zone with volume of about 450,000 m3 by January 30, 2023 to hand over the site plan to the Client for their preparation of building the HRC plant facilities of the Project.

Besides the construction of Hoa Phat Dung Quat 2 Steel Integrated Complex Project, currently C47 is also undertaking the domestic and oversea large-scale projects that using mechanizations such as Nam Phak Hydropower Project in Lao PDR (C47’s value nearly 800 billion VND), Hoa Binh Hydropower Plant Expansion Project (C47’s value nearly 1,000 billion VND), Long Thanh International Airport Project, etc. C47’s mechanization capacity, only 2022, has been focused and approved to invest by the Board of Directors and Management Board appropriate to the development scale of the Firm and the specificity of each project, the professionalism in management and construction organization is trusted and highly appreciated by the Clients.

By the Client’s trust on capacity that awarded the Amendment No.6 for adding the workload and value at Hoa Phat Dung Quat 2 Steel Integrated Complex Project, C47 affirmed its brand, prestige and professionalism in management and construction of the projects undertaken by the Company. At the same time, showing the suitability on the Firm development orientation that BOD has set out for period of 2020 – 2025.

Filed Under: News, News & Events

RELATED POSTS

50-Year Milestone: Transforming into an International EPC Contractor with the Nam Neun 1 Hydropower Project – 124 MW

50-Year Milestone: Transforming into an International EPC Contractor with the Nam Neun 1 Hydropower Project – 124 MW

Half a century has passed, and CC47 has created projects that accompany the nation’s development while building its reputation through responsibility in every undertaking. From the courage to overcome challenges ...
50-year milestone: Construction of the largest-diameter water diversion tunnel at Hoa Binh Hydropower – Vietnam’s “Project of the Century”

50-year milestone: Construction of the largest-diameter water diversion tunnel at Hoa Binh Hydropower – Vietnam’s “Project of the Century”

Over half a century, Construction Joint Stock Company 47 (CC47) has created a trail of pioneering milestones: the first enterprise in Vietnam to own a TBM, opening the era of ...
CC47 General Director attends inauguration ceremony of Unit No. 1 – Hoa Binh Hydropower Expansion Plant

CC47 General Director attends inauguration ceremony of Unit No. 1 – Hoa Binh Hydropower Expansion Plant

Morning of August 19, 2025, in Phu Tho Province, the Inauguration and Grid Connection Ceremony of Unit No. 1 (Hoa Binh Hydropower Plant Expansion Project) took place – one of ...
Chairman of the Board of Directors attends groundbreaking ceremony of Tri An Hydropower Expansion Plant – one of 250 key projects celebrating the 80th anniversary of the August Revolution and National Day on September 2

Chairman of the Board of Directors attends groundbreaking ceremony of Tri An Hydropower Expansion Plant – one of 250 key projects celebrating the 80th anniversary of the August Revolution and National Day on September 2

On the morning of August 19, 2025, in Tri An commune, Dong Nai province, Vietnam Electricity (EVN) together with Power Project Management Board 3 solemnly held the Groundbreaking Ceremony of ...
A 50-year milestone: Vietnam’s first and Southeast Asia’s largest pumped-storage hydropower plant – a strategic piece in the renewable energy landscape

A 50-year milestone: Vietnam’s first and Southeast Asia’s largest pumped-storage hydropower plant – a strategic piece in the renewable energy landscape

On the sun-drenched and windy land of Ninh Thuận (today part of Khánh Hòa province), nestled among towering mountains and tranquil headwater streams, the Bác Ái Pumped Storage Hydropower Plant ...

SUPPLIERS & CONTRACTORS PORTAL

The C47 brand has now become a quality guarantee for world-class buildings. Click on the link to join Supply Chain C47

Submit/RegisterFeedback
0256.3522166
HOTLINE

VIDEO

Công ty Cổ phần Xây dựng 47

Construction Joint Stock Company 47

Kỷ niệm 45 năm thành lập Công ty Cổ phần Xây dựng 47

45th Year Anniversary for establishment of Construction Joint Stock Company 47

Music: Hát về Công ty 47 anh hùng

https://www.xaydung47.vn/wp-content/uploads/2021/03/C47_AH_FIle_Goc.mp3

RECRUITMENT

We’re looking for Assistant to Chairman

Announcement of second recruitment in 2018

Announcement of labor recruitment phase 1 in 2018

Recruitment announcement for the first phase of 2017

Announcement of labor recruitment phase 3 in 2016

COMPANY INFO

  • General Introduction
  • Achievements and Awards
  • Organizational Chart
  • Communist Party & Unions
  • Quality Policy of Company

INVESTOR RELATIONS

  • Information
  • Financial Report
  • Annual Report
  • Announcement
  • Minutes & Resolutions

CONTACTS

Main Office Building C47:
  • No 8 Bien Cuong - Quy Nhon Nam - Gia Lai
  • 0256.3522166 - 0256.3522931
  • c47@xaydung47.vn

C47

Copyright © 2025 Công ty Cổ phần Xây dựng 47
Developed by Vũ Phong Energy Group