C47

  • Tiếng Việt
  • English
  • Home
  • Introduction
    • General Introduction
    • Vision – Mission – Core values
    • Download Introduction
    • Achievements and Awards
    • Organizational Chart
    • Communist Party & Unions
    • Quality Policy of Company
  • Works & Projects
    • Hydraulic Works
    • Hydroelectric Works
    • Civil & Industrial construction works
    • Video Clips
  • Investment
    • Construction & Services
    • Equipments & Technology
    • Other Sectors
  • News & Events
    • News
    • Science – Technology
    • Reportage – Special subject
    • Economy – Social Affairs
  • Shareholder Relations
    • Shareholder information
    • Financial Report
    • Annual Report
    • Announcement
    • Shareholder Meeting
    • Minutes & Resolutions
    • Management reports
    • Charters & Regulation
  • Information
    • Bidding
    • Recruitment
    • On-going projects undertaken by C47
  • Contacts
C47 > Information > Bidding > Invitation for bids Package NN1_CK-GT04: Design, Manufacture, Supply, Transport Installation, Load Testing, Inspection and Handover of Lifting Equipment – Nam Neun 1 Hydropower Project, Lao PDR

29/09/2026 by

Invitation for bids Package NN1_CK-GT04: Design, Manufacture, Supply, Transport Installation, Load Testing, Inspection and Handover of Lifting Equipment – Nam Neun 1 Hydropower Project, Lao PDR

Construction Joint Stock Company 47, as the EPC Contractor of the Nam Neun 1 Hydropower Project in Xiengkhouang Province, Lao PDR, announces the Invitation to Bids (ITB) for Package NN1_CK-GT04: Design, Manufacture, Supply, Transport, Installation, Load Testing, Inspection and Handover of Lifting Equipment – Nam Neun 1 Hydropower Project, Lao PDR, with the general information as follows:

  1. Name of project: Nam Neun 1 Hydropower Project.
  2. Brief information of the project:
    • Nam Neun 1 Hydropower Plant, with an installed capacity of 124MW, is built on the Nam Neun River, at PhiengHong Village, Nonghet District, Xiengkhouang Province, Lao PDR. The powerhouse includes two (02) Francis turbine units.
  1. Package name and identification:
    • Package: Design, Manufacture, Supply, Transport, Installation, Load Testing, Inspection and Handover of Lifting Equipment.
    • Identification No.: NN1_CK-GT04
  1. Main scope of work:
    • Design, manufacture, supply, transport, installation, load testing, inspection and handover of lifting equipment at the project site; freight insurance; and equipment quality warranty.
    • Scope of supply includes:
      • One (01) gantry crane for the spillway and synchronized accessories.
      • One (01) gantry crane for the intake and synchronized accessories.
      • One (01) gantry crane for the powerhouse downstream and synchronized accessories.
      • One (01) powerhouse crane and synchronized accessories.

(Please refer to the attached bidding documents for details.)

  1. Contract form: Lump-sum package.
  2. Funding source: The financial source under the EPC contract for the project, released/disbursed by the Military Joint Stock Commercial Bank.
  3. Minimum quotation submission documents include:
    • Quotation Letter valid for 180 days from the date of quotation opening (according to the attached form), duly signed and stamped by the legal representative of the bidder.
    • Detailed documents describing the technical specifications of the equipment.
    • Company profile; Copy of Business Registration Certificate.
    • Agency Certificate or Distributor Certificate (if any).

The quotation documents must be sent directly to Procurement Division – Construction Joint Stock Company 47, No. 8 Bien Cuong Street, Quy Nhon Nam Ward, Gia Lai Province, Vietnam, or scanned copies may be sent via Email: bandauthau@xaydung47.vn no later than 09:00 AM on October 15, 2026.

    • For further clarification of the information regarding the invitation to quote, please contact the Secretary of the Procurement Committee: Mr. Phan Van Thanh – Tel.: 0975.608640.

We are looking forward to receiving your attention and cooperation.

Yours faithfully.

For and on behalf of the EPC Contractor

Nguyen Thanh Hai
Deputy General Director
Construction Joint Stock Company 47

*/ Please refer to or download the detailed bidding documents: Click here

 

 

Filed Under: Bidding, Information

RELATED POSTS

Notice of Extension of Submission Deadline for Competitive Quotation Invitation – Package: Quotation for Customs Clearance Services for Import/Export Procedures into the Lao PDR at Nam Kan Border Gate

Notice of Extension of Submission Deadline for Competitive Quotation Invitation – Package: Quotation for Customs Clearance Services for Import/Export Procedures into the Lao PDR at Nam Kan Border Gate

Construction Joint Stock Company 47 (the Employer) has issued Invitation for Quotation No. 683/2026/CC47-BĐT dated April 22, 2026 regarding the provision of customs clearance services for import/export procedures into the ...
Invitation for quotation provision of Customs Clearance Services for Import/Temporary Import – Re-export in Laos for Nam Neun 1 Hydropower Project

Invitation for quotation provision of Customs Clearance Services for Import/Temporary Import – Re-export in Laos for Nam Neun 1 Hydropower Project

Construction Joint Stock Company 47, as representative of the EPC Contractor of Nam Nuen 1 Hydropower Project in Xiengkhouang Province, Lao PDR, announces the Invitation for Quotation (IFQ) for Providing ...
C47 Announcement on Clarification of Bidding Documents for Package NN1_CD-GT02 (4th Time), Nam Neun 1 Hydropower Project

C47 Announcement on Clarification of Bidding Documents for Package NN1_CD-GT02 (4th Time), Nam Neun 1 Hydropower Project

Construction Joint Stock Company 47 (Purchaser CC47) would like to extend our respectful greetings and sincere thanks for the cooperation of the Bidders during the past time. After receiving questions ...
Invitation to Bid for Package NN1_LD-GT10: Installation of Electromechanical Equipment – Nam Neun 1 Hydropower Plant, Lao PDR

Invitation to Bid for Package NN1_LD-GT10: Installation of Electromechanical Equipment – Nam Neun 1 Hydropower Plant, Lao PDR

Invitation to Bid for Package NN1_LD-GT10: Installation of Electromechanical Equipment – Nam Neun 1 Hydropower Plant, Lao PDR 15/09/2025 Construction Joint Stock Company 47, representing the EPC Contractor of the ...
CC47 Notice on Clarification of Bidding Documents (No.3) for Package NN1_CD-GT02 under the Nam Neun 1 Hydropower Project

CC47 Notice on Clarification of Bidding Documents (No.3) for Package NN1_CD-GT02 under the Nam Neun 1 Hydropower Project

CONSTRUCTION JOINT STOCK COMPANY 47 CLARIFICATION OF BIDDING DOCUMENTS (No.3)For Package NN1_CD-GT02 under Nam Neun 1 Hydropower Project, Lao PDR. To: Our esteemed companies and partners, First of all, Construction ...

SUPPLIERS & CONTRACTORS PORTAL

The C47 brand has now become a quality guarantee for world-class buildings. Click on the link to join Supply Chain C47

Submit/RegisterFeedback
+84 256.3522166
HOTLINE

VIDEO

Corporate Video C47 – The 50-Year Journey (1975–2025)

Construction Joint Stock Company 47

Dự án Hành trình xanh - Tri thức số

Green Journey – Digital Knowledge

Music: Hát về Công ty 47 anh hùng

https://www.xaydung47.vn/wp-content/uploads/2021/03/C47_AH_FIle_Goc.mp3

BIDDING

Invitation for bids Package NN1_CK-GT04: Design, Manufacture, Supply, Transport Installation, Load Testing, Inspection and Handover of Lifting Equipment - Nam Neun 1 Hydropower Project, Lao PDR

Invitation for bids Package NN1_CK-GT04: Design, Manufacture, Supply, Transport Installation, Load Testing, Inspection and Handover of Lifting Equipment – Nam Neun 1 Hydropower Project, Lao PDR

Notice of Extension of Submission Deadline for Competitive Quotation Invitation – Package: Quotation for Customs Clearance Services for Import/Export Procedures into the Lao PDR at Nam Kan Border Gate

Notice of Extension of Submission Deadline for Competitive Quotation Invitation – Package: Quotation for Customs Clearance Services for Import/Export Procedures into the Lao PDR at Nam Kan Border Gate

COMPANY INFO

  • General Introduction
  • Achievements and Awards
  • Organizational Chart
  • Communist Party & Unions
  • Quality Policy of Company

INVESTOR RELATIONS

  • Information
  • Financial Report
  • Annual Report
  • Announcement
  • Minutes & Resolutions

CONTACTS

Main Office Building C47:
  • No 8 Bien Cuong - Quy Nhon Nam - Gia Lai
  • 0256.3522166 - 0256.3522931
  • c47@xaydung47.vn

C47

Copyright © 2026 Công ty Cổ phần Xây dựng 47
Developed by Vũ Phong Energy Group