C47

  • Tiếng Việt
  • English
  • Home
  • Introduction
    • General Introduction
    • Download Introduction
    • Achievements and Awards
    • Organizational Chart
    • Communist Party & Unions
    • Quality Policy of Company
  • Works & Projects
    • Hydraulic Works
    • Hydroelectric Works
    • Civil & Industrial construction works
    • Video Clips
  • Investment
    • Construction & Services
    • Equipments & Technology
    • Other Sectors
  • News & Events
    • News
    • Science – Technology
    • Reportage – Special subject
    • Economy – Social Affairs
  • Shareholder Relations
    • Shareholder information
    • Financial Report
    • Annual Report
    • Announcement
    • Shareholder Meeting
    • Minutes & Resolutions
    • Management reports
    • Charters & Regulation
  • Information
    • Bidding
    • Recruitment
    • On-going projects undertaken by C47
  • Contacts
C47 > News & Events > News > C47 urgently construct Nam Neun 1 Hydropower Project

03/08/2024 by

C47 urgently construct Nam Neun 1 Hydropower Project

Upon signing the novated EPC Contract “Engineering, Procurement and Construction” – Nam Neun 1 Hydropower Project on July 11, 2024. The Joint Venture (JV) Contractor led by Construction Joint Stock Company 47 (HOSE: C47) promptly carried out the preparatory work for soon construction of the project.

Perspective image of Nam Neun 1 Hydropower Project.

Nam Neun 1 Hydropower Project is built in Ban Phianghong, Muang Nonghet, Xiangkhouang Province, Lao PDR, invested by Nam Neun 1 Hydropower Co., Ltd. The project consists of 2 units, with total capacity of 124 MW. As per the signed contract, the construction period is 48 months, the project is expected to be completed in the third Quarter of 2028 and export electricity to Vietnam.

Photo: Location of Nam Neun 1 Dam seen from satellite.

According to the signed EPC contract, the JV Contractor will execute the following tasks: Site Survey, Design; Construction of the Work Items (Main Dam, Spillway, Headrace Tunnel, Penstock, Powerhouse, Switchyard, Cofferdams, Quarries, etc.), and procurement and installation of various equipment.

With the extensive construction experience and capacity for many key national projects such as: Dong Nai 4 Hydropower Project (Dak Nong Province), Da Nhim Hydropower Plant Expansion Project (Lam Dong and Ninh Thuan Provinces), Thuong Kon Tum Hydropower Project (Kon Tum Province), Trung Son Hydropower Project (Thanh Hoa Province), Bac Ai Pumped-Storage Hydropower Project (Phase 1), and RCC Dam Projects of Tan My Irrigation System (Ninh Thuan Province), Dinh Binh Reservoir, Dong Mit Reservoir (Binh Dinh Province), Nuoc Trong Reservoir (Quang Ngai Province), etc. C47 has fully mastered construction technologies, experienced staffs and modern equipment to organize the construction ensured the project schedule.

Nam Neun 1 Hydropower Project is a large-scale and crucial project for the Owner, with strict requirements on the quality and construction progress, so the JV Contractor is required for construction organization in scientific, methodical, urgent and highly responsible manner. Therefore, completing the project on schedule is the top target that the JV Contractor and experts of the JV Members are aiming for.

Filed Under: News, News & Events

RELATED POSTS

INAUGURATION OF THE DESIGN AND BIM DEPARTMENT AT THE REPRESENTATIVE OFFICE IN HANOI

INAUGURATION OF THE DESIGN AND BIM DEPARTMENT AT THE REPRESENTATIVE OFFICE IN HANOI

On July 14, 2025, Construction Joint Stock Company 47 (C47) held the inauguration ceremony of the Design and BIM Department at its Representative Office in Hanoi. This strategic step aims ...
Construction Joint Stock Company 47 Commits to 100% Renewable Energy Use, Advancing Sustainable Development on the Occasion of Its 50th Anniversary

Construction Joint Stock Company 47 Commits to 100% Renewable Energy Use, Advancing Sustainable Development on the Occasion of Its 50th Anniversary

The year 2025 marks the 50th anniversary of the establishment and development of Construction Joint Stock Company 47 (CC47) – a leading enterprise in the field of energy infrastructure, hydropower, ...
Chairman of the Board and CEO of Construction Joint Stock Company 47 inspect construction progress and attend Mid-Year Review Ceremony at Nam Phak Hydropower Plant site

Chairman of the Board and CEO of Construction Joint Stock Company 47 inspect construction progress and attend Mid-Year Review Ceremony at Nam Phak Hydropower Plant site

On July 11, 2025, Mr. Pham Nam Phong – Chairman of the Board of Directors – and Mr. Duong Minh Quang – Member of the Board of Directors and Chief ...
Groundbreaking Ceremony of the “Green Journey, Digital Knowledge” Project in Gia Lai Province: Spreading Digital Literacy and Green Values to Highland Communities

Groundbreaking Ceremony of the “Green Journey, Digital Knowledge” Project in Gia Lai Province: Spreading Digital Literacy and Green Values to Highland Communities

The “Green Journey, Digital Knowledge” project is a multi-stakeholder initiative jointly launched by Construction Joint Stock Company 47 (CC47) and Vu Phong Energy Group, in collaboration with partners Xanh Yêu ...
VHP successfully held the Annual General Meeting of Shareholders 2025

VHP successfully held the Annual General Meeting of Shareholders 2025

Recently, on June 15, 2025, in Binh Tuong commune, Tay Son district, Binh Dinh province, Van Phong Hydropower Joint Stock Company (VHP), a subsidiary of Construction Joint Stock Company 47 ...

SUPPLIERS & CONTRACTORS PORTAL

The C47 brand has now become a quality guarantee for world-class buildings. Click on the link to join Supply Chain C47

Submit/RegisterFeedback
0256.3522166
HOTLINE

VIDEO

Công ty Cổ phần Xây dựng 47

Construction Joint Stock Company 47

Kỷ niệm 45 năm thành lập Công ty Cổ phần Xây dựng 47

45th Year Anniversary for establishment of Construction Joint Stock Company 47

Music: Hát về Công ty 47 anh hùng

https://www.xaydung47.vn/wp-content/uploads/2021/03/C47_AH_FIle_Goc.mp3

RECRUITMENT

We’re looking for Assistant to Chairman

Announcement of second recruitment in 2018

Announcement of labor recruitment phase 1 in 2018

Recruitment announcement for the first phase of 2017

Announcement of labor recruitment phase 3 in 2016

COMPANY INFO

  • General Introduction
  • Achievements and Awards
  • Organizational Chart
  • Communist Party & Unions
  • Quality Policy of Company

INVESTOR RELATIONS

  • Information
  • Financial Report
  • Annual Report
  • Announcement
  • Minutes & Resolutions

CONTACTS

Main Office Building C47:
  • No 8 Bien Cuong - Quy Nhon Nam - Gia Lai
  • 0256.3522166 - 0256.3522931
  • c47@xaydung47.vn

C47

Copyright © 2025 Công ty Cổ phần Xây dựng 47
Developed by Vũ Phong Energy Group